NYU Marron Institute Transit Costs Project
This way, we believe that an infrastructure program totaling about $12.5 billion and new high-speed trainsets costing about $4.5 billion, both in 2024 prices, are enough to build a high-speed rail network permitting trains to reduce the trip times on the Boston-New York and New York-Washington segments to 1:56 each.
https://link.theoverheadwire.com/d4t7h
Read more...